We turn CAD and Revit drawings into detailed quantity sheets, BOQs and cost dashboards that contractors, developers and consultants can audit line by line. Cost control and shop drawings on request. Working across Egypt, Saudi Arabia and the UAE.
Click a chapter or the timeline to jump around, and turn the sound on. The cuts hit on the beat.
Quantity Surveying & Cost Consultancy
Egypt · Saudi Arabia · UAE
DWG, PDF or Revit.
Colour, mark, location.
Foundation to roof.
Sample G+3 building.
Nothing hides in a lump sum.
| A | B | C | D | |
|---|---|---|---|---|
| 1 | Mark | Element | Nr | Vol m³ |
| 2 | C1 | Column | 12 | 6.91 |
| 3 | B1 | Beam | 120 lm | 12.00 |
| 4 | S1 | Slab | 520 m² | 104.00 |
| 5 | Total concrete | 122.91 | ||
Member by member.
Openings and lintels measured.
Floors, walls, ceilings.
Model-based quantities.
By trade, in your currency.
Concrete, m³.
Variations and IPCs checked against budget.
Rebar and steel details for fabrication and site.
Ready to audit and price.
One team. Three markets.
Checker, then consultant.
Free sample takeoff.
Every takeoff we deliver can come with a live dashboard like this one. Filter by floor, switch trades and adjust unit rates to see the effect on budget.
Concrete rate includes rebar and formwork. Bar length shows share of the filtered total.
| Trade | Qty | Unit | Rate | Amount (SAR) |
|---|
Each line in the sheet points to an element on the drawing. Hover a row to find it. Figures below are illustrative samples of our format.
Quantity surveying is the core of what we do. Cost control and shop drawings sit on top of the same takeoff, so the numbers always agree.
Trade-by-trade takeoffs from CAD drawings, with every element grouped, colour-coded and numbered back to the drawing.
m³ · m² · lm · t · nrBills of quantities in your tender format or to POMI measurement rules, ready for subcontractor pricing.
Excel BOQ + QDS backupModel-based takeoff from Revit, with schedules aligned to ISO 19650 information standards.
Revit schedules → BOQMember-by-member weights for frames, purlins, bracing and stairs, with connection allowances shown separately.
kg/m · t · nrMarble, natural stone cladding, flooring, paint and ceilings measured room by room, including wastage and cut lists.
m² · lm · room schedulesBudget estimates, monthly cost reports, IPC and variation checks against the approved budget, and value engineering options compared on cost.
Budget vs actual · VE reportsRebar and steel shop drawings, with bar schedules and connection details, issued for fabrication and site and coordinated with the quantities we measure.
Rebar details · steel details · bar schedulesSite and quantity experience on large residential, commercial and high-end finishing projects in Saudi Arabia and Egypt.
Currency, unit rates and BOQ format follow the market you build in. Switch markets in the dashboard above to see the difference.
Villas, towers, factories and finishing packages, measured and priced in Egyptian pounds.
WhatsApp: +20 102 020 7346Residential, commercial and high-end finishing projects, with SCE-registered engineering on the team.
Rates in Saudi riyalsTakeoffs, BOQs and cost control for contractors, developers and consultants, priced in dirhams.
Rates in UAE dirhamsShare DWG, PDF or RVT files and the scope you need measured.
We measure one floor or one trade so you can check our method and accuracy.
A fixed price and delivery date for the full scope, agreed before work starts.
QDS sheets, marked-up drawings, BOQ and dashboard, reviewed twice. Questions answered after handover.
We hire quantity surveyors, BIM technicians and estimators for Egypt, Saudi Arabia and the UAE. Send your CV even if no role is listed.
Send one floor or one trade. If the sheet meets your standard, we quote the rest.